ClaimStakerby Imagery Atlas

State guides › California

How to stake a mining claim in California

Lode and placer claims on federal land in California follow the federal mining law and Public Resources Code 3900-3924. Here is what California requires, from discovery to the annual filings.

Lay out a California claim on the map

Lode claims

A lode claim may be up to 1,500 feet long and 600 feet wide (300 feet on each side of the middle of the vein), with parallel end lines.

Placer claims

Placer claims are 20 acres per locator, up to 160 acres for an association of 8, described by aliquot parts of at least 10 acres and complete lots.

Monument markings

Mark each monument with the corner it marks and the name of the claim. Monument types California accepts:

The notice or certificate of location

The recorded copy repeats the posted notice (claim name; locator's name and current mailing address; length each way from discovery, width each side of center and general course for a lode, or feet or acres for a placer; the date of location; the type of monuments; a description by reference to a natural object or permanent monument) and adds a statement of the markings and the section, township, range and meridian (PRC 3900, 3902, 3911).

Recording with the County Recorder

Within 90 days after posting, record a true copy of the notice with the County Recorder, with your statement of the markings of the boundaries and their character, and the section(s), township, range and meridian (PRC 3911).

Fees: About $10-15 for the first page and $3 for each additional page plus county add-ons, and the $75 SB2 (Building Homes and Jobs Act) fee per document (Gov. Code 27361, 27388.1).

Notarization

A notice of location may be recorded without acknowledgment (Gov. Code 27282(a)(3)). The annual affidavit needs a jurat.

Document format

Claim map

California does not require a map with the notice; BLM does.

Filing with BLM

Within 90 days of location, file a copy of the recorded notice, a map, and the processing, location and initial maintenance fees ($274 per lode claim or per 20 acres of placer, as of October 11, 2026) with the BLM State Office or online in MLRS.

Every year

Every year, even if you pay the BLM maintenance fee, record an affidavit with the County Recorder within 30 days after the fee or labor deadline (about October 1), stating among other things that the monuments and notices were in place (PRC 3913). Not recording raises a presumption of abandonment.

Federally, pay the $200 maintenance fee per claim by September 1, or file a small miner waiver and the annual affidavit or notice of intent to hold by December 30.

What is different in California

Sources

Reviewed October 11, 2026. This is a summary, not legal advice; confirm current fees and requirements with the County Recorder and BLM before you file.

Prepare California paperwork with ClaimStaker