Guides › Oregon
How to stake a mining claim in Oregon
Not legal advice. This is a general guide, not legal advice. We work to keep it current, but we make no guarantee that it is complete, accurate or up to date, and laws, fees and office practices change. Read the statutes and regulations linked here, check with the county recorder and BLM, and do your own research (or ask a mining-law attorney) before you rely on it.
In Oregon you locate a claim by posting a notice of discovery and location on the claim. Within 30 days of posting you mark the boundaries with wooden posts or stone or earth-and-stone mounds, and within 60 days of posting you record a copy of the posted notice with the county clerk. Placer claims taken by legal subdivisions need not be staked. Oregon has no discovery-work requirement and no required markings on posts. It does require an affidavit of annual compliance with the county within 30 days after you do the labor or pay the BLM fee.
- Oregon law: ORS Chapter 517 (Mining and Mining Claims), ORS 517.010-517.330; recording under ORS Chapter 205
- Federal law: General Mining Law of 1872 (Act of May 10, 1872, 17 Stat. 91), now 30 U.S.C. Chapter 2 (mineral lands and mining)
- BLM regulations: 43 CFR Group 3800 (BLM mining claim regulations)
- Federal requirements in every state: ClaimStaker's federal guide
Lay out a Oregon claim on the map
Governing law
- Location of lode claims is governed by ORS 517.010-517.040, placer claims by ORS 517.042-517.052, and general provisions (amendment, voidness, prior rights) by ORS 517.060-517.110. Mill sites are under ORS 517.160 and annual affidavits and co-owner forfeiture under ORS 517.210-517.330. The 2025 edition of the ORS shows no amendments to these location sections since 1999. The last changes to the location rules were in 1991 (ORS 517.010) and 1999 (recording-fee cross-references). ORS Chapter 517 (2025 ed.)
- Federal law governs discovery, claim size and the right to locate. States may add location requirements (30 U.S.C. 28). You must also record with BLM within 90 days of location and pay the federal fees. 30 U.S.C. 28 · 43 CFR 3833.11
- Who may locate: a lode claim may be located by "any person, a citizen of the United States, or one who has declared an intention to become such" (ORS 517.010(1)). A placer claim may be located by "any individual" meeting the same citizenship test (ORS 517.044). ORS 517.010, 517.044
Discovery and discovery work
- LODE: you may locate only after you discover "a vein or lode of mineral-bearing rock in place upon the unappropriated public domain of the United States within this state" (ORS 517.010(1)). PLACER: you must discover a placer deposit of minerals subject to location under federal law (ORS 517.044). ORS 517.010(1), 517.044
- Oregon has NO discovery shaft, cut, pit, drill-hole or other location-work requirement for lode or placer claims. The former placer location-work section (ORS 517.048) was repealed in 1971. Mill sites need no discovery or location work (ORS 517.160). ORS 517.048 (repealed), 517.160
- Exploration that disturbs more than one surface acre or drills deeper than 50 feet needs a DOGAMI exploration permit ($2,000 application fee). Smaller exploration is exempt, but every mineral exploration drill hole must be capped, plugged or sealed under the statutory abandonment procedures (ORS 517.705, 517.715). ORS 517.705, 517.715
Posting the location notice
- LODE: locate the claim "by posting thereon a notice of such discovery and location", that is, on the vein or lode within the claim. The statute does not fix a particular spot; the discovery point is customary (ORS 517.010(1)). ORS 517.010(1)
- The LODE notice must contain: (a) the name of the lode or claim; (b) the names of the locators; (c) the date of the location; (d) the number of linear feet claimed along the vein each way from the point of discovery, with the width on each side of the vein; and (e) the general course or strike of the vein, as nearly as may be, with reference to some natural object or permanent monument in the vicinity, and "defining the boundaries upon the surface of each claim so that the same may be readily traced" (ORS 517.010(1)(a)-(e)). Addresses are not required by the statute (BLM requires the claimant's mailing address on its filings). ORS 517.010(1)(a)-(e)
- PLACER: post the notice of discovery and location "in a conspicuous place" on the claim (ORS 517.044). Any conspicuous place on the claim satisfies the statute; it need not be the discovery point or a corner. ORS 517.044
- The PLACER notice must contain: (1) the name of the claim; (2) the name of the individual or individuals locating it; (3) the date of location; and (4) the number of feet or acres claimed, with a description "either by legal subdivisions, if practicable, or if not, then by reference to some natural object or permanent monument in the vicinity" that will identify the claim (ORS 517.044). If the claim is taken by legal subdivisions, no other reference is needed (ORS 517.046(2)). ORS 517.044, 517.046(2)
- MILL SITE: locate it the same way as a placer claim, by posting a notice in a conspicuous place on it. If the mill site belongs to a lode or placer claim, the notice must describe that claim by appropriate reference (ORS 517.160(1)). ORS 517.160
Monuments and marking the boundaries
- LODE: within 30 days after posting the notice, mark the boundaries with four monuments, one at each corner. Each must be either a substantial post projecting at least 3 feet above the ground and made of wood at least 1½ inches by 1½ inches, OR a substantial mound of stone, or of earth and stone, at least 2 feet high (ORS 517.010(2)(a)). ORS 517.010(2)(a)
- No markings are required on Oregon posts or mounds. Marking each with the claim name and corner number is good practice and helps prove the boundaries can be "readily traced" (ORS 517.010(1)(e)). ORS 517.010
- REPLACEMENT POSTS: during normal claim maintenance, any post that needs replacing and is not made of naturally occurring materials must be replaced with a wooden post at least 1½ by 1½ inches projecting at least 3 feet (ORS 517.010(2)(b)). In practice, replace metal or plastic posts with wood. ORS 517.010(2)(b)
- PLACER: unless the claim is located by legal subdivisions, mark the surface boundaries so they can be readily traced, within 30 days after posting. Use substantial posts or other monuments of the same size, materials and dimensions as for lode (quartz) claims. Place them at each corner or angle, and wherever a side or end runs more than 1,320 feet without a corner or angle, also at intervals along it (the statute says "at intervals of not less than 1,320 feet") (ORS 517.046(1)). ORS 517.046(1)
- PLACER BY LEGAL SUBDIVISIONS: the boundaries "need not be staked or monumented". The legal-subdivision description in the recorded notice "shall be deemed the equivalent of marking the surface boundaries" (ORS 517.046(2)). A legal subdivision means a subdivision of a state survey or of a U.S. survey extended over the area (ORS 517.042). ORS 517.042, 517.046(2)
- MILL SITES are located "in the same manner" as placer claims (ORS 517.160), so mark them the same way unless taken by legal subdivisions. ORS 517.160
- REMOVAL: when BLM declares a lode claim invalid, or the last holder of record drops it without transferring it by lease or sale, all location posts not made of natural materials must be removed from federal land. At the same time, posts made of natural materials must be removed or dismantled (ORS 517.010(3)). ORS 517.010(3)
Lode claim size and shape
- Oregon sets no lode length or width limits of its own; the federal maximum applies: 1,500 feet along the vein and no more than 300 feet on each side of its middle, with parallel end lines (30 U.S.C. 23). The notice must state the feet claimed each way from discovery and the width on each side of the vein (ORS 517.010(1)(d)), and four corner monuments are required (ORS 517.010(2)(a)). 30 U.S.C. 23 · ORS 517.010
Placer claims
- Placer size limits are federal (20 acres per locator, up to 160 acres for an association of 8 or more). Oregon requires a description by legal subdivisions "if practicable", otherwise by natural object or permanent monument (ORS 517.044). It adds the 1,320-foot interval-marking rule for long sides of claims not taken by legal subdivisions (ORS 517.046(1)). 30 U.S.C. 35 · ORS 517.044, 517.046
- Any location on a natural stream, near any placer mine, or on or below a placer mine's dump is subject to the prior right of mines already operating to discharge debris, gravel, earth and slickens (ORS 517.070). ORS 517.070
The certificate / notice of location (what it must contain)
- Oregon has no separate certificate of location. What you record is "a copy of the notice posted" on the claim (ORS 517.030 lode, 517.052 placer). The recorded document therefore carries exactly the posted contents: for lode, the ORS 517.010(1)(a)-(e) items; for placer, the ORS 517.044(1)-(4) items. Make sure the recorded copy matches the posted notice. ORS 517.030, 517.052
- The recording rules (ORS 205.234) require page 1 to show the name of the transaction (for example 'Notice of Location - Lode Mining Claim'), the names of the parties (the locators), and the name and address to which the recorded document is returned. If page 1 lacks these, you may attach a cover sheet; it need not be signed or acknowledged. ORS 205.234, 205.236
Recording with the county
- LODE and PLACER: within 60 days from posting the location notice, record a copy of it with the clerk of the county where the claim lies (ORS 517.030, 517.052). The clerk is the custodian of mining records. Location notices are kept with the county's mineral and mining records (ORS 205.246(1)(s)). ORS 517.030, 517.052 · ORS 205.246(1)(s)
- MILL SITE: record a copy of the notice within 30 days from posting, which is shorter than the 60 days for claims. No affidavit of location work need be attached (ORS 517.160(2)). ORS 517.160(2)
- No map is required by Oregon statute (BLM requires one), and no acknowledgment or notarization is required for a location notice under ORS 517. ORS 517.030, 517.052
- Format: text must be typed, written or printed in 10-point type or larger, on paper no larger than 8½ × 14 inches and good enough to record photographically (ORS 205.232). A document that does not meet ORS 205.232 or 205.234 is still recorded, but the clerk charges a $20 penalty in advance (ORS 205.327). The statute sets no top-margin size; follow your county's posted standards. ORS 205.232, 205.327
- Fees: $5 per page (ORS 205.320(1)(d)) plus three statewide fees per instrument of $1, $10 and $60 (ORS 205.323(1)). A one-page location notice is therefore $76 before any county-specific charges, and each extra page adds $5. ORS 205.320, 205.323
Amendments, relocations and abandoned claims
- AMENDED NOTICE: if the locator or an assign believes the original notice was defective or erroneous, or that legal requirements were not met before it was filed, they may post and record an amended notice of location. It "shall relate back to the date of the original location" but may not interfere with others' rights existing when it is posted (ORS 517.060). This applies to lode and placer claims. ORS 517.060
- VOID LOCATIONS: subject to the amendment cure in ORS 517.060, a lode location made after Dec. 31, 1898 that does not comply with ORS 517.010 and 517.030 is void. A placer location made after Aug. 9, 1961 that does not comply with ORS 517.042-517.052 is void (ORS 517.065). ORS 517.065
- ABANDONED CLAIMS: "Abandoned claims are unappropriated mineral lands." Title is obtained by a fresh location under ORS 517.010 and 517.030 (post, monument, record), "without reference to any work previously done thereon" (ORS 517.040). ORS 517.040
- CO-OWNER FORFEITURE (state procedure): if a co-owner does not contribute a share of the assessment work, the co-owners who did it may serve a written notice after the assessment year ends. Service is by the sheriff, or by weekly publication for 90 days if the co-owner is out of state. If the share is still unpaid 90 days after service or last publication, the delinquent's interest vests in the paying co-owners. The clerk records the notice, proof of service and nonpayment affidavits and issues a certificate equal to a deed (ORS 517.230-517.320). ORS 517.230-517.320
Annual requirements
- Within 30 days after doing the annual labor or improvements, OR after making the federal fee payment, the person on whose behalf it was done (or someone knowing the facts) must make and record an affidavit of annual compliance. It is recorded in the mineral and mining records of the county where the claim lies (ORS 517.210). The 30 days run from the date you work or pay, not from September 1. ORS 517.210
- The affidavit must state: (1) the name of the claim or claims (if grouped) and a reference to where each location notice is recorded; (2) the number of days' work done and the character and value of improvements, with their location; (3) the dates of the labor and improvements; (4) at whose request the work was done; (5) the actual amount paid for labor and improvements, and by whom, if not done by the owner; and (6) that the federal fee requirements have been met by the owner or agent and that the owner or agent intends to hold the claim for the applicable assessment year (ORS 517.210(1)-(6)). Fee payers fill in items 1 and 6; items 2-5 apply to labor. ORS 517.210
- A recorded affidavit is prima facie evidence of the facts it states. Failing to file it on time is prima facie evidence that the labor was not done (ORS 517.220). ORS 517.220
- Affidavit fees: $5 per page, $5 for each additional claim listed (ORS 205.320(1)(p)), plus the $1 and $10 statewide fees. The $60 fee in ORS 205.323(1)(c) does NOT apply to instruments required under ORS 517.210 to maintain mining claims (ORS 205.323(3)(a)). The affidavit must be sworn before a notary or other officer; ORS 194.285(3) gives the short-form jurat. ORS 205.320, 205.323 · ORS 194.285
- Any co-owner may do the annual assessment work. Work that complies with federal and Oregon law protects the claim from relocation (ORS 517.230). Small miners doing labor instead of paying the federal fee also have the federal county filing duty in 43 U.S.C. 1744(a). ORS 517.230 · 43 U.S.C. 1744
Other rules worth knowing
- Mineral trespass (Class C misdemeanor): intentionally, and without the claim holder's permission, entering a claim posted under ORS 517.010 or 517.044 and removing minerals; tampering with mining equipment there; or defacing a location stake, side post, corner post, monument or posted notice (ORS 517.130). Restricting access to, or harassing anyone on, an open mining area or valid claim is also prohibited (ORS 517.128), as is intentionally interfering with a lawful mining operation (Class C misdemeanor, ORS 517.133). Keep your notices posted so the trespass protection applies. ORS 517.128, 517.130, 517.133
- Motorized in-stream placer mining needs a DEQ individual or general permit for any discharge. It is prohibited up to the ordinary high-water line in rivers containing essential indigenous anadromous salmonid habitat; nonmotorized methods such as gravity and syphon dredges are exempt. Permitted dredges may not have a suction hose over 4 inches inside diameter, and motorized equipment may not run between 8 p.m. (or sunset) and 8 a.m. within 1,000 feet of a residence or campground (ORS 468B.114, 468B.116). ORS 468B.114, 468B.116
- Surface mining that extracts more than 5,000 cubic yards or affects at least one acre in 12 months needs a DOGAMI operating permit and reclamation (ORS 517.750(16), 517.790). Smaller surface mining needs a DOGAMI exclusion certificate (ORS 517.753, amended 2025): application fee up to $400, annual renewal up to $200. ORS 517.750, 517.753, 517.790
- Mining claims, lode or placer, are real estate (ORS 517.080). Conveyances and mortgages follow real-property rules (ORS 517.090). Grubstake contracts must be in writing, name the parties and the duration, and be recorded with the county clerk, or they are void (ORS 517.110). ORS 517.080-517.110
- State-owned land is not open to location under the federal mining law. Exploration on land administered by the Department of State Lands is coordinated by DSL and DOGAMI (ORS 517.735), and minerals there are obtained through DSL leases or permits (ORS chapter 273). ORS 517.735
- BLM requirements apply in addition: federal recording within 90 days of location (with a map), and the annual maintenance fee or small-miner waiver by September 1. BLM Oregon/Washington publishes a mining-claim packet. BLM OR/WA mining claim packet · BLM: Mining Claims
Federal filing and fees (every state)
- Within 90 days after the date of location, file a copy of the recorded notice or certificate, a map, and the processing, location and initial maintenance fees ($274 per lode claim or per 20 acres of placer, as of October 15, 2026) with the BLM State Office or online in MLRS. 43 CFR 3833.11 · 43 CFR 3834.11
- Every year, pay the $200 maintenance fee per claim by September 1, or, if you qualify as a small miner (10 or fewer claims), file a maintenance fee waiver and do the annual assessment work. 43 CFR 3834.11 · 43 CFR 3835.10
Details: the federal guide.
Sources
- ORS Chapter 517 (2025 ed.)
- 30 U.S.C. 28
- 43 CFR 3833.11
- 30 U.S.C. 23
- 30 U.S.C. 35
- ORS 205.234, 205.236
- ORS 194.285
- 43 U.S.C. 1744
- ORS 468B.114, 468B.116
- BLM OR/WA mining claim packet
- BLM: Mining Claims
Reviewed October 15, 2026. This is a general guide, not legal advice. We work to keep it current, but we make no guarantee that it is complete, accurate or up to date, and laws, fees and office practices change. Read the statutes and regulations linked here, check with the county recorder and BLM, and do your own research (or ask a mining-law attorney) before you rely on it.