ClaimStakerby Imagery Atlas

State guides › Washington

How to stake a mining claim in Washington

Lode and placer claims on federal land in Washington follow the federal mining law and RCW 78.08. Here is what Washington requires, from discovery to the annual filings.

Lay out a Washington claim on the map

Lode claims

A lode claim may be up to 1,500 feet long and 600 feet wide (300 feet on each side of the middle of the vein), with parallel end lines.

Placer claims

Placer claims are 20 acres per locator, up to 160 acres for an association of 8, described by aliquot parts of at least 10 acres and complete lots.

Monument markings

Mark each monument with the name of the claim and the date of location. Monument types Washington accepts:

The notice or certificate of location

The recorded lode notice states the locators, the date of location, the feet claimed on each side of the discovery, the general course of the lode and a description by reference to a natural object or permanent monument (RCW 78.08.050). The placer notice states the claim name, the locators, the date of discovery and posting, and a description by legal subdivisions (RCW 78.08.100).

Recording with the County Auditor

Record the notice with the County Auditor within 30 days after it is signed (RCW 78.08.040), and in any event within 90 days of discovery for a lode claim (RCW 78.08.050) or 30 days of discovery for a placer claim (RCW 78.08.100).

Fees: About $303.50 for the first page and $1 for each additional page (state and county fees as of July 2025).

Notarization

RCW 78.08 requires no acknowledgment for location notices; affidavits must be sworn.

Document format

Claim map

Washington does not require a map with the notice; BLM does.

Filing with BLM

Within 90 days of location, file a copy of the recorded notice, a map, and the processing, location and initial maintenance fees ($274 per lode claim or per 20 acres of placer, as of October 11, 2026) with the BLM State Office or online in MLRS.

Every year

Within 30 days after the end of the assessment year (about October 1), record an affidavit of labor or of the federal fee paid with the County Auditor (RCW 78.08.081).

Federally, pay the $200 maintenance fee per claim by September 1, or file a small miner waiver and the annual affidavit or notice of intent to hold by December 30.

What is different in Washington

Sources

Reviewed October 11, 2026. This is a summary, not legal advice; confirm current fees and requirements with the County Auditor and BLM before you file.

Prepare Washington paperwork with ClaimStaker